<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Solar and Mains in Parallel in Arlo Pro 4</title>
    <link>https://community.arlo.com/t5/Arlo-Pro-4/Solar-and-Mains-in-Parallel/m-p/2412387#M14180</link>
    <description>&lt;P&gt;Rather than switch between solar and mains connections, I was wondering if anyone has wired up both at the same time?&amp;nbsp; A little splicing if wires wouldn't take long but I'm concerned about wiring the solar panel to the mains.&amp;nbsp; Is it possible?&lt;/P&gt;</description>
    <pubDate>Wed, 07 Aug 2024 16:15:27 GMT</pubDate>
    <dc:creator>B12ANR</dc:creator>
    <dc:date>2024-08-07T16:15:27Z</dc:date>
    <item>
      <title>Solar and Mains in Parallel</title>
      <link>https://community.arlo.com/t5/Arlo-Pro-4/Solar-and-Mains-in-Parallel/m-p/2412387#M14180</link>
      <description>&lt;P&gt;Rather than switch between solar and mains connections, I was wondering if anyone has wired up both at the same time?&amp;nbsp; A little splicing if wires wouldn't take long but I'm concerned about wiring the solar panel to the mains.&amp;nbsp; Is it possible?&lt;/P&gt;</description>
      <pubDate>Wed, 07 Aug 2024 16:15:27 GMT</pubDate>
      <guid>https://community.arlo.com/t5/Arlo-Pro-4/Solar-and-Mains-in-Parallel/m-p/2412387#M14180</guid>
      <dc:creator>B12ANR</dc:creator>
      <dc:date>2024-08-07T16:15:27Z</dc:date>
    </item>
    <item>
      <title>Re: Solar and Mains in Parallel</title>
      <link>https://community.arlo.com/t5/Arlo-Pro-4/Solar-and-Mains-in-Parallel/m-p/2412567#M14192</link>
      <description>&lt;P&gt;Not sure why you'd want to do this. Running&amp;nbsp; g off AC power keeps the battery charged so it will continue to work for a long time if power is cut. And then there's the issue of how to manage 2 external power supplies which could lead to one interfering (perhaps badly) with the other.&lt;/P&gt;</description>
      <pubDate>Thu, 08 Aug 2024 13:03:40 GMT</pubDate>
      <guid>https://community.arlo.com/t5/Arlo-Pro-4/Solar-and-Mains-in-Parallel/m-p/2412567#M14192</guid>
      <dc:creator>jguerdat</dc:creator>
      <dc:date>2024-08-08T13:03:40Z</dc:date>
    </item>
  </channel>
</rss>

